Earlier this month, because the working relationship, in a Sunday afternoon, the board of the Singapore Tourism new favorite - viewing Ferris wheel. 2002 started early this year to complete the project Ferris wheel, located in the vicinity of exports of Singapore River.
After similar to airport security checks Barrier Inflatable Bouncers Gate, carrying 28 passengers from entering the compartment. Rotating wheels, inside there will be no shaking the feeling, rather than from the Sentosa cable car more stable.
I take the wheel on that day, not many tourists to the Southeast Asian customer satisfaction, is a size to ride the Ferris wheel. Showers early, sunny afternoon in air-conditioned compartments, through the glass layer, the scenery all directions to the eye.
First of all people noted that the Ferris wheel is the home of the coastal zone. Marina Park was originally filling areas, roadside between the Inflatable Bouncers golf course. The whole film the green zone, provided a business district of the green, reinforced by regulation of forest busy.
At the same time, the busy along the coast, has a clean beach Yelin. Several sightseeing boat on the river, carrying tourists from the shuttle. From an environmental perspective, the two sides of the Kallang River ecosystem is protected by the Government deliberately and very successful.
Singapore River and Kallang River convergence of exports, there are a number of civil engineering course. The first is a dam gate (barrage). This is a new water conservancy project on the attempt, the benefits are many: the future of the dam can be increased filling and avoid the influx of sea water; several rivers and dams will create a gateway between the reservoir and improve water自供self-Singapore .
In future, in addition to sightseeing boat here, people can have a number of water sports options.
The rainy season every year, Singapore will have several flooding. Dam gates while adjusting the water level, the dam water level too high, workers can inflatable dam gates to slow down, so that part of the river into the sea. If heavy rain
Inflatable Bouncers coupled with high tide, the dam gate will start drainage pumping system.